Category Archives: Real Estate Agencies

Case Study: Ridgecliff Road Tallmadge, Ohio

Project Type: The new buyer wanted to remodel this out of date condominium. The project was a huge success. The owner loved it.

Scope of Work:   Painted the whole interior of the house, electrical, plumbing, kitchen renovation, bathroom renovation, added french doors, new carpeting.

Timeframe: 45 workdays.

Case Study: Woodbrook Trail Project Cuyahoga Falls, Ohio

Project Type: The new buyer wanted to remodel this out of date condominium. The project was a huge success. The owner loved it.

Scope of Work:   Painted the whole interior of the house, electrical, plumbing, kitchen renovation, bathroom renovation, removed wall to open up floor plan, new carpeting.

Timeframe: 36 workdays.

Case Study: Fox Hollow Lane Bath, Ohio

Project Type: Preparing for sale.  The Realtor recommended SystemToSell to prepare the 6,200 sf house for sale.

Scope of Work:   Painted the whole interior of the house, refinished the hardwood floors, (2) bathroom renovations, did many interior and exterior repairs, pressure washed the house, walks, and concrete driveway.

Timeframe: 21 workdays.

Case Study: Portland Cove Stow, Ohio

Project Type: The new buyer wanted to bring her own style to the outdated condominium. She loved the final outcome.

Scope of Work:   Painted the interior walls, ceiling, kitchen cabinets, and all the trim including the stair railings. Installed granite countertops and new cabinet hardware. Installed new hardwood flooring. Installed new light fixtures.

Results:  The new owner loved it.

Timeframe: 20 workdays.

Case Study: Westlake Blvd. Property Kent, Ohio

Project Type: Preparing the property for sale. The Realtor recommeded SystemToSell to the executors of the estate.

Scope of Work:   Painted the interior and exterior of the house. Installed new light fixtures. Pressure washed the house, garage, and driveway, and cleaned the house.

Results:  The house had 3 offers within 2 weeks of going on the market. Sold for more than asking price.

Timeframe: 15 workdays.

Case Study: Casterton Ave. Apartment Building Akron, Ohio

Scope of Work: SystemToSell was recommended by the Realtor to renovate a 7 unit apartment building in Akron that was just purchased.

Work included:  Electrical, Plumbing, drywall, interior painting, vinyl flooring, new light fixtures, new water heater,  remodeled bathrooms, repaired windows, new roof, mold remediation, and refinished the hardwood floors.

Timeframe: 20 workdays.

Case Study: Merriman Road Apartment Building Akron, Ohio

Scope of Work: The Realtor recommended SystemToSell to his client, a Savings & Loan,  to handle the renovation of a bank owned property- a 9 unit apartment building in Akron.

Work included:  Building clean-out. Interior and exterior painting , ceramic tile, plumbing repairs, reglazing tubs and sinks, carpentry, electrical  repairs, new light fixtures, power washing, tree trimming, landscaping, concrete repair, and a gravel driveway.

Timeframe: 35 workdays.

BeforeAfter

 

 

Case Study: Pine Needle Trail, Strongsville, Ohio

 

Scope of Work: The Realtor recommended SystemToSell to her client living in Strongsville that was getting ready to put their home on the market.  The owner wanted a variety of work completed called SystemToSell in to handle all the work.

Work Included:   Interior painting of the majority of the interior, ripping up the carpet and pad in 3 bedrooms and the living room, installing cabinet hardware, refinishing wood floors, installing new light fixtures, hanging new window treatments, exterior painting, installing door hardware, repairing the garage door, drywall and wallpaper repair, and misc. carpentry items.

Timeframe: 8 workdays.

Case Study: 1395 Ardoon Street Cleveland Heights, Ohio

Scope of Work: This house was renovated in preparation for the city of Cleveland Height’s Point of Sale Inspection and for listing. Work included the following- house and garage clean-out, new carpet, interior and exterior painting, carpentry, window and door repairs, powerwashing house and sidewalk, electrical improvements, chimney repair, brick repointing, yard cleanup, demolish garage, and general cleaning.

Time Frame: 12 workdays

(CLICK PHOTO TO ENLARGE)
BeforeAfter
Enhanced by Zemanta